Rene Rivera
a3dffe8f1a
Update docs for check utility changes and for 1.3 release. Bump versions
...
for release of 1.3. Update copyrights that I forgot on the previous
commits.
2015-07-01 17:19:29 -05:00
Rene Rivera
0f113b0871
Fix non-standard test feature test collection. I.e. make the feature
...
collection no rely on implementioned defined behaviour. And fix check
program handling of no-expression invocations vs expression invocations.
2015-06-29 18:49:33 -05:00
Rene Rivera
40a722d69b
Fix warning for undefined macro usage.
2014-07-06 21:49:24 -05:00
Rene Rivera
3ccc33fa28
Update copyrights back to original author.
2014-01-10 08:46:03 -06:00
Rene Rivera
cf90bd0219
More stringent testing of OSX BSD like behavior. Fix BSD mis-detection
...
on OSX depending on include order.
2013-10-14 23:21:51 -05:00
Rene Rivera
6007034752
Fix repeat def of OS_BSD when sub-BSD flavor detected. Fix some make
...
tests that fail on non-2003 compile modes.
2013-10-14 23:00:52 -05:00
Rene Rivera
b28bad14ea
Address endian compile errors for OSX in the cases where sys/param.h was
...
include ahead of the predef headers. The solution was to: use the OSX
machine/endian.h header, and only allow a single OS to be detected at
once. Test cases added for both conditions on OSX.
2013-10-05 16:41:55 -05:00
Rene Rivera
9fcecba7cc
Most changes from review comments implemented. Remove use of "#elif" for
...
backward PP compatability. Add BOOST_category_item_AVAILABLE as a
defined, or not, symbol for use with "#ifdef" or "#ifndef". Add
documentation of macros used for detection and version information. Also
replace direct use of BVN(0,0,0) and BVN(0,0,1) with more meaningful
macros that are globally defined, and hence consistent.
2013-01-18 21:25:30 -06:00
grafikrobot
68470ca33e
Add definition docs for all the predefs.
2013-01-10 23:23:37 -06:00
Rene Rivera
fe6037697c
Get the doc building working again (with the quickbook-dev branch).
...
Update html docs to match latest code state.
2013-01-05 15:31:59 -06:00
Rene Rivera
dbb5965186
Restructure the project to match new modular layout.
2012-12-28 22:25:52 -06:00