into a single combined integration-test-setup-cluster-resources
workflow. This ensures that the same gha runner preparation, go version,
etc. is used for both the canary and integration tests.
(cherry picked from commit c5bfe3a)
Change from the original version:
- Keep the test target k8s versions as are.
Signed-off-by: Joshua Hoblitt <josh@hoblitt.com>
Signed-off-by: Satoru Takeuchi <satoru.takeuchi@gmail.com>