The topology spread constraint example allowed scheduling even if the TSC could not be satisfied when scheduling the osd prepare jobs. This could lead to unevenly spread OSDs especially when the cluster was not using the zone labels. Now the topology will be required for scheduling, to ensure proper spread of the OSDs. Signed-off-by: Travis Nielsen <tnielsen@redhat.com>